During 2007 Warehouse Storage Solutions Ltd provided several solutions to satisfy the requirements of the LNT Group of Companies:

  • Basic Solutions
  • LNT Construction
  • LNT Automotive
  • Team LNT
LNT Group Logo
LNT Pallet Racking  

Phase 1 of the contract was to supply and install pallet racking at 8.2m high to give 1,008 locations complete with safety mesh, column guards and barrier protection. 

 

 

Phase 2 was to install a mezzanine floor @ 133.2m to provide workspace below for the maintenance and manufacture of Ginetta cars and storage of car parts above.

Mezzanine Floor   Maintenance Area
Mezzanine Floor   Maintenance Area
Board Room   Offices
Board Room   Offices with Firewall

Phase 3 was to install 2 further mezzanine floors to provide office space. Floor 1 was 375.39 Sq/m and Floor 2 was 46.98 sq/m. Both floors were encased with a one hour fire protection. Warehouse Storage Solutions was also given the task of installing a fire wall around the floors. The fire wall was 45,675mm long x 12,200mm high with 8 windows at the first floor level.

 

 

Phase 4 was to install floor to ceiling partitions on the mezzanine floors to provide offices, boardroom, kitchens, toilets, laboratory, communications rooms, archive storage, gymnasium and boutique. And all finished off with ceilings and lighting.

Kitchen   LNT Development
Kitchen   Recreation Area
Board Room   Gymnasium
Board Room   Gymnasium

After completion of the above projects, Warehouse Storage Solutions was approached by LNT Automotive & Team LNT requesting that we supply and install additional pallet racking, long span racking and shelving.  

Warehouse Storage Solutions Ltd completed all of the above works two weeks earlier than the contracted time frame and have since been invited back to make various modifications and additional installations of pallet racking, shelving, kickboards and hand rails. 

Total cost of The LNT Group projects was £161,785.00


PZ Cussons Plc – Phase 1
Stores and Maintenance Department

Warehouse Storage Solutions was invited into initial talks with PZ Cussons in September 2007 to find the best way to house the company's Stores and Maintenance Department.

PZ Cussons

After surveying the new site that was still under construction, Warehouse Storage Solutions presented a drawing illustrating a Mezzanine Floor, Offices on the first floor level with shelving and maintenance rooms on the ground floor level. Warehouse Storage Solutions were tendering for the business along with 4 other companies. After further discussions and examining the current operation PZ Cussons & Warehouse Storage Solutions decided that the first designs would not be effective and increased the mezzanine floor size to 7,800 ft2. The design also included Shelving, Workshop, Training Room, Welding Room, Ink Jet Room and Staff Room. Of which all was to be housed on the first floor level. Into the rooms we had to design and supply power, network and telephone points.

PZ Cussons - Messanine Floor Mezzanine Floor
PZ Cussons - Mezzanine Floor PZ Cussons - Mezzanine Floor

After the final stages of design and quoting and a visit to the LNT Group, Warehouse Storage Solutions was chosen to take the project forward. We were also given the task of providing a suspended ceiling, inset lighting, smoke detection and a sprinkler system to the underside of the Mezzanine Floor and marrying the colours of the Mezzanine Floor to match the same colour of the existing steelwork.

PZ Cussons - Shelving Work Rooms
PZ Cussons - Shelving PZ Cussons - Mezzanine Floor
Mezzanine Floor Mezzanine Floor
Mezzanine Floor Mezzanine Floor

PZ Cussons Plc – Phase 2
Perfume Factory

Following the completion of Phase 1, two weeks ahead of schedule, Warehouse Storage Solutions was then invited to design the Pallet Racking for the perfume factory where PZ Cussons would store the perfumes and chemicals for the soaps, shampoos, washing-up liquids and body washes. Warehouse Storage Solutions worked with PZ Cussons and Eric Wright Construction on the design of the Pallet Racking and In Rack Sprinkler System. After numerous designs Warehouse Storage Solutions was awarded to contract for the fit out of the factory. Warehouse Storage Solutions installed 1,200 Pallet Locations, Column Guards, Anti-collapse Safety Mesh and End of Rack Barrier Protection. Again the project was designed, supplied, delivered and installed ahead of schedule, but this time by only one week.

pz_pallet_racking.jpg
Pallet Racking

 

 

Warehouse Storage Solutions is currently involved in working with PZ Cussons on Phase 4 of the project, which is now in the advanced planning stage

Rack Sprinkler
Rack Sprinkler

PZ Cussons Plc – Phase 3
Goods In

Warehouse Storage Solutions and PZ Cussons have built up an excellent working relationship and has gained yet again, the trust of its client. We have now been asked to supply deliver and install Phase Three. This consists of stripping down existing pallet racking from the old factory and re-instating it in the Goods In of the new factory. Installing new anti-collapse mesh and line feeding conveyors to take full pallets of empty bottles to the filling machines. At the moment this phase is on going and still heading to be completed ahead of schedule.